Summary print

Preview & Print

Properties

Steps (18) arrow_drop_up arrow_drop_down
Location map  (1) expand_more expand_less
Architectural, structural and other drawings  (1) expand_more expand_less
Site clearance from Bhutan Power Corporation  (4) expand_more expand_less
Environmental clearance  (3) expand_more expand_less
Official site plan  (4) expand_more expand_less
Construction permit  (5) expand_more expand_less

2
Prepare architectural and structural drawings
(last modified: 31/01/2023)

Contact details

Entity in charge

Any licensed architect/ engineer or architectural/ engineering firm


Expected results

Architectural drawings
Structural drawings
Sanitary/ sewerage drawing
Plumbing/ water supply drawings
Electrical/ telephone connection drawings

Cost Free

Certain fee may be applicable and the amount may depend on size of the project and other factors.

Time frame

The duration may depend on the size of the project and other factors.

Legal justification

1. Bhutan Building Rules 2018
Bhutan Building Rules 2018 Section 7, 9, 11, 12, 13, Annex 4
2. Bhutanese Architectural Guidelines 2014
Bhutanese Architectural Guidelines 2014

Additional information

All the drawings should conform with the drawing guidelines as specified in Annex 4 of the Bhutan Building Rules 2002. Once complete, all drawings should be signed by the applicant, the designer and the developer. The architectural drawings should conform with the Bhutanese Architectural Guidelines 2014.
Powered by eRegulations ©, a content management system developed by UNCTAD's Business Facilitation Program and licensed under Creative Commons License